Construction for the next 6 Months
Contact Project Managers below at 252-328-6858
Family Medicine Complex
This new building will house both the Family Medicine Center and the Geriatric Clinic. The Program of the building will include faculty and staff offices, exam rooms, clinic support spaces, teaching rooms, and the required building support functions. The project will also include landscape work, parking lot construction, and campus utility distribution work that will be needed to support the operation of the building. The estimated size of the building will be 117,185 square feet and the estimated cost of $46.8 million will include design, construction, FFE, and owner reserves.
Bid Expected: November 2008
Project Manager: Robert Still
Founders Drive and Wright Circle Repave
Mill existing asphalt paving and install new asphalt paving of roads to include new traffic markings and minor curb and gutter repair; approximately 6000 SY of area.
Bid Expected: February 2009 Estimate: $70,000
Project Manager: Ricky Hill
Brody Building Dermatology Renovation
Renovate existing suite for new waiting, reception, conference room, offices, exam rooms and labs, etc. for approximately 4500 SY of space.
Bid Expected: August 2008 Estimate: $200,000
Project Manager: Ricky Hill
Building 127- Human Resources
Renovate existing first floor for new file storage and offices (1000 SF) and cosmetic upgrades for remaining of first floor (5000SY).
Bid Expected: August 2008 Estimate: $100,000
Project Manager: Ricky Hill
Proctor Yongue House
Restoration of home built in 1917 for use as a guest house to include architectural and mechanical/electrical upgrades for approximately 3000 SY of space.
Bid Expected: September 2008 Estimate: $300,000
Project Manager: Ricky Hill
Brody Building Roof Replacement
The roof sections are divided up into five areas which total approximately 12,000 Sq. Ft. A complete tear off of the existing roofing and insulation down to the vapor barrier will be required. The vapor barrier is to be repaired or replaced if needed. Light weight concrete insulation with positive drainage is to be installed. Address masonry wall flashing were required. The new membrane is to be a three ply system with a modified bitumen cap sheet. The roof system will have a twenty-five year material warranty and a two year contractor's warranty.
Bid Expected: November 2008 Estimate: $307,100
Project Manager: Gerry Gable
Bate Building Roof Replacement
The Bate Building is located on the core campus at East Carolina University. The existing system is a three ply built up roof system that was installed in 1985. The system is showing signs of age with deteriorating felts and blisters. Several areas have been patched to stop leaks. The new roof will be light weight insulated concrete system designed to give proper drainage of the roof. The existing vapor barrier will be inspected during roof tear off and repaired or replaced. The new membrane will be a three ply system with a modified bitumen cap sheet. The roof system will have a twenty-five year material warranty and a two year contractor's warranty.
Bid Expected: December 2008 Estimate: $828,300
Project Manager: Gerry Gable
Messick and McGinnis Buildings Window Replacement
Messick and McGinnis are adjacent buildings located on the core campus at East Carolina University. The buildings date back to 1927 and 1951 respectively and have the original wood, single Glazed windows and caulking. They are in poor condition. The design is for installing new windows with some operable section, thermal break frames and insulated glass with low E rating
Bid Expected: February 2009 Estimate: $286,000
Project Manager: Gerry Gable
Brewster Structural Repair-Caulking
Remove and replace all exterior caulked joints in the stone facade. This includes caulking, sealants, and expansion joints (caulked) for window perimeters, door perimeters, joints between precast panels and brick control joints.
Bid Expected: November 2009 Estimate: $260,000
Project Manager: Gerry Gable
Mall Area Repair Storm Drainage
Clean and slip line forty-eight (48) inch storm drainage line.
Pre-Bid: June 19, 2008 Bid: July 1 2008 Estimate: $300,000
Project Manager: Gerry Gable
Garrett Residence Hall Door Replacement
Replace suite and Lavatory Doors with Rated Doors
Bid Expected: December 2008 Estimate: $300,000
Project Manager: Gerry Gable
Howell Science HVAC Upgrades Package B
Project involves demolition of existing ductwork & air handling units in 3 penthouses located above North, South & East Tower along with vertical chase ductwork demolition in each tower; installation of new vertical ductwork in chases and new ductwork in penthouses connecting to new air handling units from previous project; installation of new electrical services for relocated services. All Temporary utilities from previous phase and this contract must be removed followed by new roof installation. Building will be occupied during entire project duration.
Bid Expected: October 2008 Estimate: $2,500,000
Project Manager: Robert Still
Coastal Studies Institute
Project is the construction of a 90,000 square foot complex on 40 acres of land in Manteo, NC. The project will have an academic/administrative area, laboratory area, research plots, and residential facilities. Project will be LEED certified.
Bid Expected: ON HOLD Estimate: $30,000,000
Project Manager: Gina Shoemaker
Construction Manager at Risk: Whiting Turner
Mendenhall Student Center/Ledonia Wright Cultural Center Renovation & Additions
Project is a comprehensive renovation of the existing 123,000 square foot Mendenhall Student Center with a 500 person ballroom addition. A new 16,000 square foot Ledonia Wright Cultural Center will be constructed adjacent to the existing student center.
Bid Expected: ON HOLD Estimate: $38,000,000
Project Manager: Gina Shoemaker
Construction Manager at Risk: TA Loving